Kowloon Canton Railway
BRITISH SECTION
ESTIMATE
Main Head: BRIDGES
Sub. Head: MINOR BRIDGE No.36
Work One: 201 Girder at chain 84-650 Drawing C.R.E. No.258
Item DESCRIPTION Quantity Unit Rate AMOUNT Excavation in foundations 219 10/- 2,190 Timbering and Pumping 600 300 Concrete in foundations 9,900 A Masonry in Superstructure 31.5 00 Masonry in coping bedstones &c. 200 00 Dry stone backing 1,250 35/- 2,555 2,0.ft 10/- 3,960 1. 20 ft Girder landed in Kowloon 00 1 20 ft Girder, transport, erection & painting 00 12 50 500 100 Total 8,246.50 Contingencies 10% 824 Grand Total 9,071.16Page 201
C.R.E. No. 24.
105
201
q6wlish notns) noolwoЯ
.MOITO32 Ne17133
TAMIT23
„TZ JOKA
ཏིrtཝཱ ྃ།
$
VOIT 182214
a C.RE. No. 24.
kowloon Canton Railway.
105
BRITISH SECTION
ESTIMATE.
bust nisl.
unst duż
Axo #
Main Head
Sub. Head
BRIDGES
MINOR BRIDGE No.36
Work One 201 Girder at chain 84-650 Drawing C.R.E. No.258
Quantity.
DESCRIPTION.
82.
AMOUNT.
Rate. Unit.
Cts.
00
00
writeberat ni acidevant
DEA Wor* DEN TRÅTBRİT
Lorokte biwot at 6.6nonet
.*7739 **ateng ni vizowal
21,900
Item
Excavation in foundations.
10/-
219
Timbering and Pumping.
600
300 | Conorete in foundations.
9,900 onry in Superstructure.
00
31.5
A
200 Masonry in ecping bedstones &e.
00
.
1,250 Dry stone backing.
35/-%
40/%/
2/-0.ft 10/-%
2,555
3,960
400
CO
200
aloes onože ma 00
{
1. 20 ft Girder landed in Kowloon.
1 20 ft Girder, transport, erection & painting
00
00
00
8 8 8 8 8 8 8 80
12 50
500 00
100
00
CO
ન
S'TE
00 206.FR
01 zəiɔnigniɔno?
intol
Total
8,246 50
Contingincies 10%
C24
jol bag10
Grand Total
65
9,071; 16